Please see the message from NDOT:
BOULDER CITY, NEV. – The Nevada Department of Transportation (NDOT) reports that northbound travel along Boulder City Parkway (U.S. Route 93 Business) between Industrial Road and Bullock Field Drive will temporarily be shifted onto southbound lanes for grading and paving work from 9 p.m., November 12, through 6 a.m., November 14, in Boulder City. American Civil Constructors/Meadow Valley will be doing the work. Motorists will still be permitted through the area, although travel delays are possible. However, no over dimensional loads will be allowed through the work zone during construction.
Motorists should use caution while travelling through the work zone, heed construction signage, and take alternate detour routes, if possible. NDOT works with Waze to inform the public about planned highway restrictions, but unscheduled construction changes, closures and restrictions are possible due to weather or other factors. For the latest state highway conditions, visit nvroads.com or call 511 before driving.